The Pavilion

The Pavilion

Wednesday, December 22, 2010

Two days til handover (hopefully)

Yes, handover is supposedly going to be Thursday morning. Very exciting. It all depends on the bank though, whether we get the final payment in time. I have everything crossed, as if it's not Thursday, we will have to wait until the 17th of January, which is when Perry's opens up again following the Christmas break. I couldn't stand to spend most of the school holidays in this tiny 2 bedroom unit - I am so over it - especially when I know our home is ready and waiting for us. We have carpet being installed Thursday afternoon, and our fridge on Friday, so here's hoping we have the keys to let them in. When we started building, the supervisor gave us a rough time frame of 14 - 16 weeks for completion. Well, it's 16 weeks exactly on Thursday, so that's pretty good I reakon. It was touch and go for a while there, as to whether it would be finished before Christmas, but they came through in the end. Even with a change of supervisor, things kept moving. Now it's just up to the bank.....Will update soon

The girls' bedroom cupboards


Each of the girls room have mirrored robes, which thankfully should put a stop to the fighting over the mirror. We're getting the carpets put in ourselves Thursday afternoon (after handover Thursday morning - touch wood)

Bella in the kitchen sink

Ensuite


I like that the ensuite is quite large (after all it had to fir our spa in), and that it has its own seperate toilet (which you can't see in this shot). Basin and vanity are quite boring I suppose in comparisant to what's around these days, but I don't mind them

Ensuite shower


The girls shower is very much the same. I love the recess. We had one put in our old bathroom shower and think they are well worth the bit of extra money/fiddling around

Ensuite shutters


These shutters are just above the spa and look into our bedroom (you know what I mean). I love them.

Tuesday, December 21, 2010

Our 'bargain' spa


We bought this spa cheap ($500) as it was the display model, and were going to install it in our old house when we were thinking of renovating. We brought it to this house though, but had to have it installed ourselves (Perry's didn't want to do it as it didn't have it's own levelling frame - or whatever its called). $1000 later, and its installed. So our bargain spa which was reduced from $1500 to $500, ended up costing us $1500 anyway. Never mind, all will be forgiven when I have my first spa in it, I'm sure.

Dining 'room'

From living room towards front door


I'm posting one pic at a time as internet connection is so crappy here, it drops in and out and I lose it all.

Kitchen benchtops (Essa Stone in French Nougart) and splashback



The benchtops and the splashback compliment each other quite nicely (in my opinion anyway)

Kitchen finished - 16th December 2010


Quite pleased with the kitchen. The tiles on the splashback aren't as dark as they appear in the photo.

Door with handle (and a very cute baby) 14th December 2010

Gararge door and driveway done - 10th (?) December 2010


What a difference a garage door and driveway make, eh?

Our Bella Baby

Thursday, December 2, 2010

So far........2nd December 2010

Well, we're getting there. When I ask "Can we still expect to be in by Christmas?" I get something along the lines of "We'll definitely try". The other day I was asked by the BS "Would it be the end of the Earth if you weren't in by Christmas?", to which my reply was that of course it wouldn't be the end of the Earth (I'm not THAT over-dramatic) but that I WOULD be dissapointed. Actually that just might be an understatement.

Still waiting on kitchen benches, which I was told today may possibly be held up until January sometime, which would of course stop us moving in. The BS is trying to source another one urgently though, so we'll see how we go. Fingers crossed.

Speaking of BS, we have a new one, as the one we had is on leave until early January. Incidentally, I didn't know about this until I tried to call him with a couple of queries. Hmmmm... Anyway, not going to complain too much at this stage as long as job keeps moving forward at a good pace. The novelty of living in a cosy 2 bedroom unit has worn off. Tomorrow we have the concreter coming to do the driveway/paths etc, then on the weekend the painters will be here. Apparently they come as a big team from Sydney and will have the job done in 3 days. I have to try to catch them to make sure the stain for the gables and front door match the garage - bad look otherwise. Tiler went home sick today, so that won't be finished til next week.

All in all, looking good so far. Fingers crossed it continues

Wrong basins -22nd November 2010


Took me a couple of walks through the house til I realised the basins in the ensuite and main bathroom had two holes too many (we are having flickmixers throughout).

Front door-November 2010


Should be nice when it's stained and has the proper door handle (which is polished chrome and a much more stylish design).

Family/Living Room - 22nd November

Kitchen so far - 22nd November 2010

House with gables November 2010